Bridge Design
LEAP Bridge Concrete CONNECT Edition V18 Update 1
LEAP Bridge Concrete CONNECT Edition V18 Update 1 is powerful modeling and analysis software for concrete bridges of all types: precast, cast-in-place, reinforced, and post-tensioned.
What's New in LEAP Bridge Concrete CONNECT Edition V18 Update 1 (July 20, 2018):
The release contains enhancements and bug fixes. The main enhancements are summarized below.
AASHTO LRFD 8th Edition Update
- Updated the references of detailed design reports per the reorganized Section 5 of LRFD
- Removed the simplified procedure in shear design
- Updated the torsional cracking moment Tcr
- Updated the Fatigue Limit State
- Updates of the graphic user interface (GUI) for all superstructure and substructure modules
Pennsylvania option for the State Specifications (phase II)
- Update the existing limit states per DM-4
- Support PennDOT’s new limit states
Extension of TxDOT enhancements
- Customized analysis reports of substructure design
- Support TxDOT’s standard X-Beams/Box Beams, Slab Beams, and Decked Slab Beams
Support Nebraska DOT’s standard NU Beams, IT Beams, and rebars
Download rapidgator
https://rg.to/file/4e3103373691f9e4ef7fd49dfbdd6862/pABriCoCE180116.rar.html
Download nitroflare
http://nitroflare.com/view/A6B29FDCE3D225B/pABriCoCE180116.rar
Related articles
- CSI Bridge 26.1
- CSI Bridge 25.3.1
- OpenBridge Designer CONNECT Edition 2023 update 1(23.00.01.024)
- Autodesk Structural Bridge Design 2025
- Bentley RM Bridge V8i (SELECTSeries 3) 08.10.18.01
- Bentley LEAP Bridge Enterprise V8i (SELECTSeries 6) 13.00.00.68
- Bentley Bridge Design and Engineering 2013 Suite
- CSI Bridge v16
- CSI Bridge v17
- Bentley RM Bridge Advanced+ V8i 08.11.28.02 with RM Bridge View
Comment/コメント
Comment list/コメントリスト
- No comments/コメントはありません