CAD.CAM

Location:HOME > Bridge Design > Introduction

Bridge Design

LEAP Bridge Steel CONNECT Edition V18 Update 1

cadcamaec@protonmail.com2023-10-04Bridge Design87
What’sNewinLEAPBridgeSteelCONNECTEditionV18Update1-August,2018:Thefollowingenhancemen

What’s New in LEAP Bridge Steel CONNECT Edition V18 Update 1 - August, 2018:

The following enhancements and bug fixes are available in this release.

Enhancements

- AASHTO LRFD 8th Edition Updates
- I-Girder Field Splice Design per AASHTO LRFD 8th Edition
- Phase II for PennDOT Design Manual - Part 4 Design Checks

Bug Fixes

This release fixes a number of issues including:

- Error in automatic wearing surface load and quantity calculation
- Defect regarding reporting of capacities in cross-frame report
- A file specific error when performing RSA analysis

Download rapidgator
https://rg.to/file/514f83983c0b9e973fe2c58221ce4b8d/aLBiSteCE18U1.part1.rar.html
https://rg.to/file/4c2b3b7fe2943b0a4c6dbb72ef23390d/aLBiSteCE18U1.part2.rar.html

Download nitroflare
http://nitroflare.com/view/C8F48ED3B6C19EF/aLBiSteCE18U1.part1.rar
http://nitroflare.com/view/2B25F09FD426BFB/aLBiSteCE18U1.part2.rar


Comment/コメント

Comment list/コメントリスト

  • No comments/コメントはありません