CAD.CAM

Location:HOME > Bridge Design > Introduction

Bridge Design

LEAP Bridge Steel CONNECT Edition V20

cadcamaec@protonmail.com2023-09-16Bridge Design109
LEAPBridgeSteelCONNECTEditionV20(build20.00.00.24).Thisupdatereleasecontainsenhancements

LEAP Bridge Steel CONNECT Edition V20 (build 20.00.00.24). This update release contains enhancements and bug fixes.

What’s New in LEAP Bridge Steel CONNECT Edition V20 (Date: May 28, 2020)

Interoperability to read functional components from OpenBridge Modeler
This enhancement offers the ability of modeling and designing steel bridges with complex substructure using the functional components under OpenBridge Designer’s BIM workflow.
Interoperability to read new substructure alignment from OBM
This enhancement offers the capability to read new substructure alignment options in OpenBridge Modeler under the OpenBridge Designer’s BIM workflow.
Live load deflection check per AASHTO LRFD
This enhancement offers the optional live load deflection design check per AASHTO LRFD (Art 2.5.2.6).
Quantity report of main girders for steel tub girder bridges

Download rapidgator
https://rg.to/file/79143f2926fdc50efea4d3a760f05349/aLBiSteCE20.rar.html

Download nitroflare
https://nitroflare.com/view/8A1A05207AB0359/aLBiSteCE20.rar


Comment/コメント

Comment list/コメントリスト

  • No comments/コメントはありません